Drilling and commissioning of 01 nos. Hand pump at Lal Bagicha near Gangasagar rehab site under Rajmahal Area.
21-Sep-2026
29-Sep-2026 upto 11:00 Hrs.
30-Sep-2026 at 11:00 Hrs.
1295
ECL/GM/JNR/EnM/A2/26-27/52, dt. 18-Sep-2026
Supply, Installation and Commissioning of Neutral Grounding Resistance (NGR) Monitoring System along with Winding Temperature and Oil Temperature Indicator Assembly for 01 No. 1.2 MVA, 6.6kV/3.3kV Transformer at PSLW Workshop, Jhanjra Project Colliery.
21-Sep-2026
05-Oct-2026 upto 11:00 Hrs.
06-Oct-2026 at 11:00 Hrs.
1296
ECL/GM/JNR/EnM/A2/26-27/51, dt. 18-Sep-2026
586.5 mtr i.e. 17 pillars (as pillar length center to center is 34.5 mtr.) shortening of (6.6KV/95Sq.mm) cable, (550V/70sq.mm) cable with salvaging these total cables to surface for depillaring of panel in R-VII seam in LHCM2 section at 3&4 Incline,JPC.
21-Sep-2026
05-Oct-2026 upto 11:00 Hrs.
06-Oct-2026 at 11:00 Hrs.
1297
ECL/GM/JNR/EnM/A2/26-27/50, dt. 18-Sep-2026
Repairing of 140 nos. heavy duty 1200 mm pressure rollers of 1200 mm 2nd belt conveyor, MIC, JPC.
Recapping of both side ropes (02 times for 01 year) of A-Shaft Winder, MIC, JPC.
21-Sep-2026
05-Oct-2026 upto 11:00 Hrs.
05-Oct-2026 at 11:30 Hrs.
1299
SS/GM/SURV/26-27/20, dt. 19-Sep-2026
Cleaning and renovation of existing drain, filling of pot holes and surface cracks both side of Kapila road, Sripur under Ningha Group of mines, Satgram-Sripur Area, ECL.
21-Sep-2026
03-Oct-2026 upto 17:00 Hrs.
05-Oct-2026 at 11:00 Hrs.
1300
ECL/PC/E&M/Tender/26-27/07, dt. 21-Sep-2026
Work for repairing of Roto-4 Stage Pump at Parasea Colliery.
21-Sep-2026
29-Sep-2026 upto 17:00 Hrs.
01-Oct-2026 at 12:00 Hrs.
Best viewed on 1024 x 768 screen resolution.
DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL