Drilling and commissioning of 01 nos. Hand pump at Lal Bagicha near Gangasagar rehab site under Rajmahal Area.
21-Sep-2026
29-Sep-2026 upto 11:00 Hrs.
30-Sep-2026 at 11:00 Hrs.
1342
ECL/GM/JNR/EnM/A2/26-27/52, dt. 18-Sep-2026
Supply, Installation and Commissioning of Neutral Grounding Resistance (NGR) Monitoring System along with Winding Temperature and Oil Temperature Indicator Assembly for 01 No. 1.2 MVA, 6.6kV/3.3kV Transformer at PSLW Workshop, Jhanjra Project Colliery.
21-Sep-2026
05-Oct-2026 upto 11:00 Hrs.
06-Oct-2026 at 11:00 Hrs.
1343
ECL/GM/JNR/EnM/A2/26-27/51, dt. 18-Sep-2026
586.5 mtr i.e. 17 pillars (as pillar length center to center is 34.5 mtr.) shortening of (6.6KV/95Sq.mm) cable, (550V/70sq.mm) cable with salvaging these total cables to surface for depillaring of panel in R-VII seam in LHCM2 section at 3&4 Incline,JPC.
21-Sep-2026
05-Oct-2026 upto 11:00 Hrs.
06-Oct-2026 at 11:00 Hrs.
1344
ECL/GM/JNR/EnM/A2/26-27/50, dt. 18-Sep-2026
Repairing of 140 nos. heavy duty 1200 mm pressure rollers of 1200 mm 2nd belt conveyor, MIC, JPC.
Recapping of both side ropes (02 times for 01 year) of A-Shaft Winder, MIC, JPC.
21-Sep-2026
05-Oct-2026 upto 11:00 Hrs.
05-Oct-2026 at 11:30 Hrs.
1346
ECL/SDPA/E&M/26-27/Tender/156, dt. 19-Sep-2026
Complete repairing of 3.3kV, 60 Amps. A/Y make Air Circuit Breaker (Switch) of Mithani Colliery under Sodepur Area.
19-Sep-2026
28-Sep-2026 upto 17:00 Hrs.
29-Sep-2026 at 16:00 Hrs.
1347
ECL/SDPA/E&M/26-27/Tender/157, dt. 19-Sep-2026
Loading, Transportation and placing one no. 315kVA, 3.3kV/550V Transwitch unit and one 3.3kV, 400Amps switch and one 550V, 300Amps switch from 52L/1D to 72L/4D in Dhemomain Incline Colliery under Sodepur Area.
19-Sep-2026
28-Sep-2026 upto 17:00 Hrs.
29-Sep-2026 at 16:00 Hrs.
1348
GM/Kaj/EnM/Tender/26-27/48, dt. 18-Sep-2026
Repairing of hydraulic traction motor (RH) 01 no and gear box assy 02 nos of Eimco make SDL 1825 of Jambad Colliery.
Dismantling and Rail carrying by manuall and carrying wooden sleeper from old working district of Gopinathpur Seam to Surface through 5/6 Incline of Hariajam Colliery.
Construction of Brick wall in between 12th level and 13th level in S.P.Middle Seam and repairing of pucca drain from 27 No Incline mouth of Haulage line upto 2nd level both side and in 28 No incline (Travelling Roadways) east side upto 2nd level along with bush cutting upto 30 mtr out by from of 28 no incline mouth at Hariajam Colliery.
19-Sep-2026
28-Sep-2026 upto 17:00 Hrs.
05-Oct-2026 at 13:00 Hrs.
Best viewed on 1024 x 768 screen resolution.
DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL