New re-organisation of power supply for 56nos Air Conditioners (ACs) and Supply & Installation of Electrical accessories i.e. Switches, MCB, Cable etc.
26-Aug-2026
08-Sep-2026 upto 17:00 Hrs.
09-Sep-2026 at 11:00 Hrs.
2164
ECL/GM/MA/E&M/26-27/eTender/15, dt. 26-Aug-2026
Erection and Diversion of 3.3 KV Overhead Line near 5K (East Side of BOCP) and shifting of 25KVA, 3.3KV/220V Lighting Transformer along with Diversion of 220V P-P Lighting Line with relocation of 100W/ 200W Flood Lights at BOCP.
• CORRIGENDUM
26-Aug-2026
07-Sep-2026 upto 17:00 Hrs.
17-Sep-2026 at 14:00 Hrs.
2165
GM/PND/AE(E&M)/2026-27/85/2524, dt. 25-Aug-2026
Complete repairing & overhauling of 01 no Andrew Yule make 3.3 KV 400 Amps VCB at 27L/4-5D of B-Pit &01 no. Mine line make 3.3 KV 400 Amps VCBat 33L/4-5D of A-Pit of Pandaveswar Colliery.
26-Aug-2026
05-Sep-2026 upto 18:00 Hrs.
07-Sep-2026 at 18:00 Hrs.
2166
GM/PND/AE(E&M)/2026-27/84/2523, dt. 25-Aug-2026
Dismantling, Lifting, Transportation of the VCT Boiler No. WBL 9394 from Ramanagar unit Pit No. 3 and Installation at Pit No. B existing boiler site for Cleaning, Dry Inspection, repairing, Hydraulic Test and inspection for certificate of the same VCT boiler for getting the Final Certificate of Boilers under No. B Pit Pandaveswar Colliery.
26-Aug-2026
05-Sep-2026 upto 18:00 Hrs.
07-Sep-2026 at 18:00 Hrs.
2167
GM/PND/AE(E&M)/2026-27/82/2522, dt. 25-Aug-2026
Complete repairing and rewinding work of a total of three (03) numbers of 10 HP, 550 V, 3-phase, 2900 RPM submersible pump motors for ensuring smooth water supply to the residential quarters and boiler reservoir from Riverside borehole, Old 7 No. Pit, and water reservoir at Madhaipur Colliery.
26-Aug-2026
05-Sep-2026 upto 18:00 Hrs.
07-Sep-2026 at 18:00 Hrs.
2168
CKC/Agent/Tender/26-27/2158, dt. 24-Aug-2026
Construction of 03 (three) nos. of pump foundation as and when required at 2no. X-Cut of Lower Kajora (R-VIII Top) seam of Central Kajora Colliery.
26-Aug-2026
09-Sep-2026 upto 13:00 Hrs.
09-Sep-2026 at 15:30 Hrs.
2169
CKC/Agent/Tender/26-27/2157, dt. 24-Aug-2026
Proposal for construction of 03 nos. Haulage Foundation at required locations in proposed pannel Lower Kajora (R-VIII Top) seam of Central Kajora Colliery.
Survey and preparation of surface plan and Composition with Underground Mine Plan showing up-to-date surface features in the leasehold area Bansra Colliery falling under Bansra Mouza.
26-Aug-2026
09-Sep-2026 upto 13:00 Hrs.
11-Sep-2026 at 15:00 Hrs.
Best viewed on 1024 x 768 screen resolution.
DISCLAIMER : Information on this site is believed to be accurate but ECL disclaims any liability for any errors or omissions that may occur from time to time.
EASTERN COALFIELDS LIMITED, Sanctoria, Post: Dishergarh, Dist.: Burdwan, W.B., PIN - 713 333 • Tel: 0341-2520052-53, 2520414 • Fax: 0341-2523574 • Gram: EASTCOAL